1 thought on “Changzhou Jinlong Cup cost requirements?”
Rebecca
1. First of all, public buildings are more than 5,000 square meters of a single, and the group is more than 10,000 square meters. 2, the second industrial plant is 5,000 square meters or 24 meters span (maximum span). 3, the last residential building is more than 3,000 square meters of multi -layer monomers, more than 5,000 square meters of high -rise single, and more than 20,000 square meters in the community.
1. First of all, public buildings are more than 5,000 square meters of a single, and the group is more than 10,000 square meters.
2, the second industrial plant is 5,000 square meters or 24 meters span (maximum span).
3, the last residential building is more than 3,000 square meters of multi -layer monomers, more than 5,000 square meters of high -rise single, and more than 20,000 square meters in the community.