1 thought on “Flexible cast iron drainage pipe installation process”

  1. The groundwater system in urban construction is an extremely complicated and very important project because it is related to the safety of the city's drainage. When we set up a drainage pipe, we usually use a flexible cast iron drainage pipe. This tube is good and has strong corrosion resistance. Therefore, it can be used in a longer use process without much deformation. Next, I will briefly introduce the installation process of flexible cast iron drainage pipes.
    The technical preparation
    Is when installing flexible cast iron drainage pipes, a series of technical preparation must be made first. For example, we must prepare related professional drawings, and we must do the corresponding technical and environmental security confidence. And all the materials used in construction should be recognized by the relevant units and must have the corresponding construction safety qualification certification. The next step is the corresponding construction materials, and the construction materials include the construction water pipe used and the model of the pipe. The flexible cast iron water pipe must meet the corresponding design requirements and should maintain the same appearance. There will be no damage or trachoma.
    official construction
    In the formal construction process, and the flexible cast iron drainage pipe must not be set, such as the wall floor and other structural layers. And each honor of the pipeline interface of the cast iron drainage pipe is required to be far away from the wall at least 150 meters away. At the time of construction, the installer should do the reserved holes and reserved pipes when the water pipe crosses the wall in advance. Because the specific environment of installation is different, the drainage pipe needs to be cut on the field. When cutting, the end surface and straight pipes of the incision should be ensured at each other, and the incision should be polished and smooth. When the drain pipe needs to be installed in the wiring, we should use a axis. We can allow the interface to have a little error, but the deviation of its interface must not be greater than 3 degrees.
    The ground laying
    Is when the pipeline is installed, the sealing paste must be coated at the interface of the pipeline. When entering the underground drainage pipes, a deep gap should be opened first. For the depth of height, there is also a series of requirements for high ditch bodies exceeding 40 cm and the trench depth of more than three meters. To remove some of the gravel from the drain pipe to the grassroots level, if some rugged grounds are treated, some fine sand needs to be paved to prevent the pipe from being damaged later.
    above is some of the main contents of the installation of flexible cast iron drainage pipes compiled by Xiaobian. During the installation of the drainage pipe, it is necessary to follow the above specifications. At the same time, it is necessary to make flexible changes according to the specific situation during construction to ensure that the construction period can be completed normally, and the high standards of construction quality can be ensured, so that our city is more beautiful to make the people live more comfortably. Essence

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Cart