1 thought on “The demand for smart meters is not strong. How does the meter company develop a diversified industry?”
Brandy
The demand for smart meters is not strong. How does the meter company develop a diversified industry?
- "One of the Measures for the Development of the Mecar Industry in 2017"
This Chinese modern power grid measurement technology platform
December 10, 2017
2017 was another turnaround point in the history of the meter industry development exhibition. The demand for smart meters has suddenly fallen into the trough from the prosperity period of 7 consecutive years (2010-2016).
Id what are the highlights in the development process of the meter industry in 2017, and can it promote the continued research and application of the industry development in 2018?
· Intelligent meter demand is not strong. How can electric meter companies open a diversified industry?
· Follow topics of new technologies of the meter: mainly with the "instrument cloud" technology application, use the telecommunications interest and power grid gateway meter metering system to expand the system measuring function, the State Grid "dual core" intelligence The meter sample machine development and network operation assessment, Shanghai Power Grid formulated and implemented status testing and rotation schemes in single -phase smart meter operation, smart (advanced) terminals, DC electric power meters, broadband low -voltage power wire carrier communication interconnection and other technical standards were released , Implementation.
. The process of using telecommunications collection system communication technology bottlenecks: Mainly 4G wireless communication becomes the mainstream of remote communication, broadband low-voltage power line carrier communication expansion application, Beidou satellite communication pilot in multiple places, nb- --TOT communication exploration in the automatic metering system in the smart meter.
· State Grid "multi-table" information collection has slowly advanced, and the demand for gas meter metering has increased significantly. NB --- LOT communication is first applied in the meter meter metering collection; The National Development and Reform Commission and the General Administration of Quality Supervision, Inspection and Quarantine jointly issued the "Promotion and Construction of the Energy Consumption System for the Energy Unit of Key Energy Units", improve the energy measurement system, and promote the modernization and upgrading of electricity, water, gas, and thermal energy measurement and collection systems.
The highlights of the development of the meter industry in 2017, this article will be divided into narrative and release.
One of the highlights: The demand for smart meters is not strong. How does the meter company develop a diversified industry?
1. In 2017, the demand for smart meters of the State Grid fell into the trough, and the demand for collecting terminals dropped sharply. New changes of the bidding volume and demand
The national network of 2017 smart meters concentrated bidding volume of 37.78 million. Among them, the first bidding volume was 20.92 million, accounting for 55%of the total number of bidding for the year; the second bidding volume was 16.66 million, accounting for 45%. Two bidding volume is generally balanced. However, the total bidding for smart meters in 2017 (37.78 million) decreased by 62.2%of the highest annual bidding volume (100 million) in 2014.
-State Grid: In 2017, the total bidding of smart meters has been close to the bottom line of demand. The interpretation and reference of the new technical needs of the meter market and metering of the metering:
· In 2017, the coverage rate of telecommunications interest collection system for the provincial power grid reached more than 99%, and 17 million smart meters needed.
. The natural growth rate of new users of the state network power supply business area is about 3%, and 12 million smart meters need to be used.
· The construction of local government affordable housing, 3 million smart meters need to be used.
· Sale County, Dai Guan County Shang State Network Management 3 million tables.
· Measurement fault treatment (measurement failure rate is about 0.5%) with 2 million tables.
-The new change presented by the centralized bidding of the national network smart meter in 2017
· New phenotype. State Grid issued a 2 -level single -phase smart meter to increase the technical requirements of the battery. The bidding volume of batteries can be replaced by batteries throughout the year is 13.27 million, accounting for 41%of the annual single -phase smart meter bidding (32.37 million).
· New accessories: ultra -high -frequency RFID module, single -phase measuring failure identification module, measuring field operating terminal and peripheral storage box, three -phase measuring failure identification module, and on -site printing module.
The technical specifications of new accessories above: (to be query).
2) Collect new changes in the centralized bidding volume and demand of terminals
. In 2017, the annual centralized bidding volume was collected by 7.81 million units. Among them, the first batch of collection terminal bidding was 7.06 million units, accounting for 90%of the total annual bidding; the second batch of bidding was 760,000 units, accounting for 10%of the total bidding for the year. Wire. At the same time, the total number of concentrated bidding (7.81 million units) collected terminals in 2017 decreased by 29.5%compared to the highest bidding volume (11.09 million units) in the collection of terminals in 2016. These situations explanations: The construction of a telecommunications interest collection system for the provincial power grid has entered the ending stage.
In 2017, the new changes in the centralized bidding of the State Grid:
-Public Network 4G wireless communication module application becomes the mainstream of remote communication n2017 In the year, the total bidding of the collection terminal (4G) module was 960,000 yuan, accounting for 66.7% of the total number of concentrator (converted 579,000 units) and the total number of specialized terminals (860,000 units) (14.39 million units). Essence Among them:
· The first batch of collection of terminal bidding for the first batch of 4G modules of 4G modules. Including:
The type Ⅰ (4G/broadband) 135,000 blocks
The type Ⅰ (4G/micro -power wireless) 22,000 blocks
The type Ⅰ (4G/narrow belt) 212,000 blocks
The Type III (4G) 120,000 yuan
· 2017 2nd batch of collection terminal bidding 4G modules are 471,000 yuan. Including:
The type Ⅰ (4G/narrow belt) 161,000 blocks
The type Ⅰ (4G/broadband) 135,000 yuan
Type II, III (4G) of the specialty terminal Ⅱ, III (4G)
The bidding volume of the above concentrator (4G) module can be known: the local communication methods of the concentrator include narrow belt carriers, broadband carrier waves, micro -power wireless wireless wireless Communication 3 category. It needs to be explained here: In recent years, the application of OFDM narrow belt rapid communication technology has increased, and it is said that it can reach a communication rate of 20K BPS.
-Broadband low -voltage electric line carrier communication technology expansion application
2017 The broadband carrier module was needed for 7.345 million yuan (excluding the second batch of local meters local communication wide band wave module bidding volume volume ), 245%of the bidding volume of broadband carrier modules in 2016. Among them: Broadband carrier modules have become mainstream in concentors and collectors; 26%of local communication in the meter.
. In the whole year of 2017, the collector and concentrator need to use a broadband carrier module of 4.915 million yuan, accounting for 71%of the annual collector and concentrator bidding (6.95 million units).
a1 The first batch of collectors and concentrations in 2017 requires 4.78 million broadband carrier modules, including:
The type Ⅰ (4G/broadband carrier) 135,000 Block
The collector type II (broadband carrier) 4.364 million pieces
The collector type (broadband carrier) 281,000 yuan
A2 2017 2017 The second batch of collectors and concentrations must use a broadband carrier module (concentrator type: 4G/broadband carrier)
135,000 yuan
· 2017 batch 1 The local communication (broadband carrier) module of the meter needs 2.43 million yuan, accounting for 26%of the total bidding for local communication modules in the first batch of telecommunications modules.
In 2017 The second batch of telecommunications (broadband carrier wave) module in 2017: (to be inquired)
3) In the first two years, Jiangsu and Shandong Power Grid has achieved smart meters. The full coverage of applications and telecommunications collection systems, why does it continue to have a large amount of demand for smart meters and acquisition terminals in 2017?
In 2014, Jiangsu Power Grid took the lead in the construction of the telecommunications interest collection system (36 million households); in 2015, Shandong Grid achieved a 100%(38 million households) coverage of the telecommunications interest collection system.
-The first batch of national network smart meters in 2017, collecting terminal centralized bidding n · Jiangsu Grid 4.955 million units in this batch, accounting for the country 76.4%of the bidding volume of the network collector. The demand for a single -phase single -phase smart meter is 2.53 million, accounting for 6.6%of the total number of Jiangsu Power Grid (38 million households).
. The dictatorship terminal demand for the Shanxi Power Grid is 310,000 units, accounting for 54%of the bidding volume of the State Grid Specialty Terminal. Level 1 three -phase smart meter bids 822,000 units, accounting for 20.5%of the three -phase user (about 4 million households) of Shandong Power Grid.
-The 2nd batch of smart meters in 2017, collecting terminal centralized bidding
. 2.8 million single -phase smart meters in Shandong Grid Demand The first place in the meter requires 19.4%of the bidding volume of the smart meter in this batch. The demand for the centralized device is 120,000 units, and the first place in the provincial power grid concentration device accounts for 27%of the demand for the State Grid concentration instrument.
-above the situation: After the smart meter application of the provincial power grid and the construction of the telecommunications interest collection system are completed, the system meter and acquisition equipment continues to have the need for updates and expansion. n · New user growth. The natural growth rate of new users of the year is 3----- to 5%. For provincial-level power grids with 40 million households, the annual demand single-phase smart meter is 12 million to 2 million.
· Early three -phase electric meter and collection terminal need to be updated. According to the 2009 version of the national network standard, the three -phase meter and collecting terminals. Because of its functions and reliability, many aspects do not meet the requirements of the 2013 version of the country network standards. Some smart meters and collecting terminal replacement need to be performed in advance.
· Application II collector. Local communication uses broadband carrier waves, which can greatly shorten the collection cycle.
· Smart meter, collection terminal or need to increase inventory reserve.
2, State Grid: 2010 --- 2017 Intelligent meter demand end and 2018 demand evaluation
1) 2010 --- 2017 End of the demand for smart meters r
2009 In the fourth quarter, the State Grid carried out the first centralized bidding for smart meters, but the bidding volume was not large.
2010 --- 2017, the State Grid organizes 2-4 smart meters in large quantities of centralized bidding each year. Essence
2010 --- 2017 National Net smart meter application and electric information collection system to achieve full coverage process:
years, A: Smart meter bidding volume, B: Cumulative number of collected households, C: Total number of users of the State Grid, D: Collection coverage
-In 2010, A: 045 million, B: 128 million households, C: 220 million households, D: 12.7%
-in 2011, A: 60 million only only only , B: 066 million households, C: 257 million households, D: 25.6%
-A: 76 million, B: 110 million households, C: 280 million households, D: 39.2 %
-in 2013, A: 066 million, B: 180 million households, C: 310 million households, D: 58%
-in 2014, A: 1 100 million, B: 256 million households, C: 378 million households, D: 68%
—— 2015, A: 91 million, B: 316 million households, C: 395 million households, D D, D, D : 80% rn rn — 2016年,a: 0.66亿只,b:3.82亿户,c: 4亿户,d:95.5% rn rn — 2017年,a : 038 million, B: 430 million households, C: 434 million households, D: 99%
Instructions: The above data is excerpted in online information or calculated for reference.
In the data of the centralized bidding of the national network smart meter from the above 2010-- 2017, and combined with the comprehensive situation of centralized bidding for smart meters, the national network materials department has been summarized to refine the demand for smart meter in the country, The law of changes in investment, the reference of the power gauge enterprise in the future when the new national network new meter bids in large quantities.
-In 2017, the State Grid power supply business area has a total of 430 million users. In the future, new users increased year by year with a natural growth rate of 3-5%year by year. For new users, the power supply department has been included in the demand for smart meters that year.
-2010--- 2017, the total bidding of the State Grid smart meter was 542 million (excluding the 2009 smart meter bidding of 111 million), and the total investment was 113.8 billion yuan.
In initial installation period of the smart meter (2010--- 2017): The average bidding volume of the National Grid annual smart meter was 68 million, with an average annual investment of 14.23 billion yuan; The maximum investment of 21 billion yuan in annual investment is 21 billion yuan; the annual bidding bottom line of smart meters is 38 million, and the annual investment bottom line is 8 billion yuan.
-2010 ----- 2017, the total bidding of the State Grid smart meter was 542 million, and the smart meter installation and applications were 140 million yuan. %. The main purpose of these balance meters is:
· Some early smart meters need to be replaced in advance. In 2009 --- 2012, a total of 192 million smart meters produced by the 2009 version of the national network standard, but it was difficult to estimate how many early smart meters were eliminated.
2010 --- 2017, the winning bidding meter company with centralized bidding for smart meters in State Grid estimated 45---75, which changed with the bidding volume of the smart meter.
· It is said that the basic requirements of the State Grid Materials Department for the bidding meter enterprise: registered capital, production and sales of electric meter performance, smart meter production, management conditions, etc.
This The author of this article believes that the key difficulties of the nuclear power meter enterprise are the independent development capabilities of the meter, the collection terminal and the system. It is understood that some of the meter companies that have been shortlisted, medium and high -end smart meters adopted by OEM, especially in the past few years, concentrator, dictatorship terminal OEM, and buying design plan accounted for a large proportion, including the top 10 bids in the bid, Electric meter company.
· Winning amount of electric meter companies. From the Internet, the information of the Smartnet smart meter and collecting terminals: The amount of winning bids for the top 3 large meter companies in the winning bid is about 6%of each batch of smart meters and collecting terminal bidding. The percentage of the amount of the winning bids of the remaining meter companies decreased in order, and the bottom line of the winning bid amount was about 1%.
· The above-mentioned bidding meter enterprises with centralized bidding for smart meters above the State Grid Smart Meckets have a low percentage of winning bids, which will adversely affect the meter enterprises and State Grid:
a1 2010- -In 2017, the meter enterprise benefited and developed due to the stable smart meter market and the lack of demand for new technologies. The development of diversified industries has begun, especially the annual marketing revenue of large meter companies has reached 200--3 billion yuan. In 2017, the centralized bidding volume of the State Grid smart meter was 38 million yuan, investment of 8 billion yuan, and the top 3 large -scale meter companies in the winning bid won 6%and 480 million yuan, which only accounting for r, which only accounts for annual operating income. n 24--16%, it is difficult to support the long-term development of electric meter companies, and prompt it to be eager to develop a diversified industry.
A2 smart meters needed by the provincial power grid, which are generally supplied by more than a dozen home appliance meter enterprises. The quality of the product is difficult to ensure the consistency. Essence
· Also, after 2012, the annual bidding volume of the State Grid smart meter increased, and the maximum annual bidding volume reached 100 million. As a result, electric meter companies have increased investment and expand production capacity. After 2017, the demand for smart meters fell into a trough, and the production capacity of the meter enterprise was seriously overcapacity and needed to be considered. Emergency supply, expanding production capacity, can take multiple measures.
2) In 2018, the demand evaluation of smart meters and the expectations of the "dual -core" smart meter to the market
-According to online forecasts, 2018 may be the needs of the meter market. In the lowest year, the bidding volume of the State Grid smart meter was about 33.44 million.
In 2018, the provincial power grid continues to have batch requirements for smart meters and collecting terminals after completing the full coverage of smart meter applications and electricity information collection systems. It has been described that State Grid: The natural growth rate of new users is 3%, and 12 million smart meters are required; the construction of local government affordable housing, 3 million smart meters must be used; With 3 million tables; 2 million tables for measurement failure. In total, the first four market elements are combined with 20 million smart meters.
· 2010 --- 2012, early smart meter applications were 192 million. If you update 7%in advance, you need to use smart electricity
Tables 13.44 million.
· The above five market elements are combined with the above five market elements. In 2018, the national network needs to use 33.44 million smart meters, which is 11.5%compared to the 2017 National Network smart meter bidding volume, which is the highest year of the smart meter in 2014 The quantity (100 million) decreased by 66.5%.
-The expectations of the "dual -core" smart meter entering the market
"Interpretation and Citation of the State Grid Power Power Power Tetal Market and New Technical Demand in May 2017" Expure the revision process of the development of the "dual -core" smart meter development and the 2013 version of the smart meter enterprise.
The current situation has changed again. Since the implementation of the Guidance of the State Grid Measurement Work in 2017 (National Power Grid Marketing [2017] No. 105), the Global Watch Magazine has successively published the "dual core" smart meter Article: "Research on the Design Plan of an Intelligent Electric Table Design Based on IR46 Concept", and "Smart Electric Power Table Design Based on OIML R46 International Proposed Intelligent Electrical Power Table". Recently, the information from the Hebei Shijiazhuang Industry Conference: The State Grid "Double Core" smart meter standard may be approved in 2018, that is, the 2013 version of the national network smart meter standard revised version, which is expected to be implemented in 2019. In this way, the "dual -core" smart meter sample machine runs after the development and inspection of the network in 2019; in 2020, there may be batch applications. It is said that because the investment of the "dual -core" smart meter installation and application has not yet been implemented, the time for the new type of meter to the market in batches may be extended by 1 year than the previous expectations.
-There is also a factor affecting the demand for smart meters in 2018: detection and status rotation in the operation of single -phase smart meters
In 2010 8 years of operation, after entering 2018 to cyclical rotation.
In 2017, Shanghai Local Measurement Regulations: "Status detection scheme of single -phase smart meters in operation" has been released and implemented in Shanghai Power Grid. However, it has not been seen that the State Grid measurement department has reported reports on single -phase intelligent power meters according to cycle or status testing and rotation methods. The annual measurement work promotion meeting held in early 2018 will make a unified arrangement. For example, the State Grid implements the status detection and status rotation method of a single -phase smart meter, and the single -phase scheme that passs the status test will extend the operating cycle for several years. This will help the power grid save resources and reduce investment;
3, meter company: How to develop a diversified industry?
Shortly after the implementation of smart meters in the State Grid, some electricity meter companies have felt that the smart meter market of the State Grid will be restricted, and it has begun to explore the exploration of diversified industries. However, the transformation of meter companies generally takes shortcuts: OEM imitation or merger target enterprises, becoming a new growth point for corporate marketing as soon as possible.
1) In May 2017, the interpretation and reference of the State Grid meter market and the needs of new technical needs of the State Grid Meeting "reminded: Symbol companies need to carefully study the topic selection of new products to develop new products.
-Except smart meter, collection terminal, low -voltage measurement box, as well as expensive and relatively large meter markets, including special meters, online monitoring, harmonic metering, 10KV electronics, 10KV electronics 9 categories of meter -in systems such as the formula -based instrumental cloud "instrument cloud.
-Power users' self -procurement market. The main measurement products are: statistical meter series, one card, energy measurement table and monitoring system, street light intelligent control system, petroleum/coal mine special measurement equipment and other 9 categories.
-considering the long -term development of the enterprise, the transformation of the meter enterprise mainly takes the path of the development of technological innovation products, including: the application of the intelligent (advanced) terminal in the field of energy measurement, the "instrument cloud" and the three -phase phase of the three phases Multifunctional meter fusion technology development, electricity information use system main station to expand big data applications, large user harmonic measurement assessment, measurement device loss data self -aid data and other functions.
2) The meter enterprise regulates the demand for the dependence of the state network's smart meter market
The previous narrative: 2010-- 2017 National Net smart meter demand and investment change laws have already been Mingshu: State Grid is a central state -owned enterprise. Smart meters and collection terminal centralized bidding are independent behaviors of the enterprise. Smart meters, collection terminals, and low -voltage measurement boxes are the three basic markets, eternal markets of electric meter companies. However, the annual recruitment, investment, and distribution strategies of the State Grid smart meter and collection terminals (that is, the number of bidders and the low amount of bids) are no longer suitable for the rapid and long -term development needs of telephone meter companies. Therefore, on the basis of continuing to do a good job of the State Grid smart meter market, the meter enterprise regulates its dependence on the SME smart meter market, and pioneering a diversified industry is a long -term and useful development process.
3) To develop a diversified industry, it is necessary to prefer development projects
In recent years, the transformation direction of large meter companies is different. According to online information: Lin Yang, it mainly develops new energy development projects, and has initially achieved results; Kelu, smart grids, energy -saving products and other positions have been developed; Victoria, focusing on the development of smart distribution products, water, gas, and thermal energy measurement measurement And energy efficiency management equipment and systems.
This of information tracking and analysis of the development of new products for transformation of electricity meter companies in this article can be considered as: Weisheng, pioneering and expanding the energy measurement industry, it is relatively stable and performance is obvious. Its main features:
-reorganized and strengthened Weisheng Information Technology Company to increase investment in funds and senior talents. It is understood that Weisheng Group has enriched a number of senior technical and management talents of the original meter and terminal products, and a number of doctoral talents enriched the Weisheng Information Technology Company.
-The starting point of the new product project of the diversified industrial product is relatively high and forward -looking. Weisheng's electricity, water, gas, and thermal energy measurement projects take AMI as the general starting point. It not only assembles water, gas, and heat meter assembly, and controls and collects. The bidding opportunities of the metering system project have been fully rolled out of electricity, water, gas, and thermal energy.
The energy metering system engineering case:
· Mining area water, electricity, gas meter meter remote collection, control project n · Uzbekistan AMI project
· The first multi -table collection item of the Southern Power Grid
· Shanghai Electric Power Company implemented "Multi -Table Collection, Multi -Units One, Multi -Fees Harvest" project
-Weisheng is based on the meter as the base, and the main business of smart distribution products, energy measurement and energy efficiency management equipment. In 2017, the operating income of Weisheng's energy measurement products is estimated to be more than 1 billion yuan, and the operating income of the smart meter may reach 0.65: 1. It can be said that the energy measurement and system development and marketing of Weisheng Information Technology Company have entered a state of stability and development, and accumulated the development experience of diversified industries.
4) The meter enterprise expands to the water, gas, and thermal energy measurement market at the time!
-The new policy for the development of the country's energy measurement has successively introduced
. In February 2016, the National Development and Reform Commission, the National Energy Administration, Industry and Information Technology jointly released the "About Promotion" The guidance of the development of the Internet "The requirements for the development of smart energy (Development and Reform Energy [2016] No. 392)" proposes: "In -depth integration of energy, information and communication infrastructure".
· I have been described earlier. In September 2017, the National Development and Reform Commission and the State Administration of Quality Supervision, Inspection and Quarantine issued a notice of the "Promotion and Construction Work Plan for the Energy Consumption System of Key Energy Units" ( ] No. 1711 proposed: Accelerate the energy consumption of the energy consumption of the energy consumption of the key energy unit and improve the requirements of the energy measurement system.
It is seen that with the advancement of the energy consumption of energy consumption system for energy Internet and key energy consumption, the opportunities for comprehensive and balanced development of electricity, water, gas, thermal energy measurement and collection system construction are coming!
-water, qi, enthusiasts, and industrial collection system construction processes are different, and the lack of authoritative high -level departments to promote the intelligent process of energy measurement vertically. The construction of the national intelligent water, gas, hot meters and collecting systems is difficult to count. However, the development of the meter enterprise is different, and the development of diversified industries needs to be developed.
In August 2016, the "Four Tables Collection of Electricity, Water, Qi, and Hot" written by Weisheng Li Hong/Shandong Power Industry Zhang Chunhui " R n a1 water meter industry: about 3,000 tap water companies nationwide, 300 water meters and supporting manufacturers. By 2015, the annual output of water meters was 90 million. Among them, smart water meters accounted for 10%.
a2 gas meter industry: about 800 gas companies nationwide. There are 100 traditional gas meter manufacturers and 30 smart gas meter companies. By the end of 2015, the annual output of gas meter was 35 million; the annual output of smart gas meter was 19 million, accounting for 35%of the total annual output of the gas meter. Gas ultrasonic flowmeters mainly depend on imports.
a3 hot meter industry: The main market is in the heating area of 15 provinces in the north. In 2013, the national heating area was 6.5 billion square meters, with heat metering of 21%, and 18 million hot meters were installed. On average, each hot meter was measured by 77 square meters. At present, the annual new heating area is 30,000 to 400 million square meters, and the annual demand is 4 million.
a4 and the meter industry: about 2,800 county -level power supply companies, and about 270 power supply companies in the country (city). By 2016, there were about 360 currently on the existing meter, and it is estimated that the annual production of 140 million meters. Among them, the State Grid and South Network adopted 80 million, export meters of 46 million, and power users' self -procurement market was 1.14 million.
In the end of 2017, the State Grid power supply business area achieves 100%coverage of smart meters and telecommunications interest collection systems (430 million households).
- "Multi -table unity" information adopts slowly promoting. State Grid, launched the "Multi -Table One" information collection project in 2015 to explore new business models. Estimation from online information: 2016--- 2017, the State Grid may implement "multi-table integration" information collection of 5 million households, and its process is different than the original plan "13th Five-Year Plan" information collection. Far. It should be said that the "multi -table integration" information collection of the State Grid has the support of the competent economic authorities of the higher level, the attention and coordination of the competent department of the local government industry, the contemporary efforts of power supply companies, and many favorable conditions for engineering funds. However, so far, the process of "multi -table unity" is slow. This is the competent department of the superior and the local government industry, the State Grid needs to think deeply, solve the problems, and adjust the relevant business strategies and requirements to ensure that the "multi -table integration" information collection continues to continue. Promote before.
-The meter enterprise integrates water, gas, hot meter, and collecting system technology, market development and application. The intelligent rate of water, gas, and heat meter meter requires a large amount of capital and senior talents. After many years of construction, the qi and thermal industry collection system already has a certain foundation. However, the system application situation is not ideal, and the communication application technology is relatively backward.
A3 industry management: The thermal energy measurement industry is coordinated and managed by the competent local government industry department. There is no unified industry management agency in the country to formulate energy meters and collect system product standards to carry out industry business exchange activities. The industry information is not smooth. The shortcomings of the development of water, gas, and thermal industries above N a4 are existing the existing development length of the meter company. At the same time, in recent years, Weisheng Information Technology Co., Ltd. You can learn from the experience of development with the market:
In online information, the integrated information collection system of Weisheng Information Technology Company is based on the telecommunications interest collection collection system. Quoting its collection terminal and communication channels, only the communication interface converter (collector) is added, and the data of smart gas meters, smart water meters, and smart heat meters is collected to the management system to achieve electricity, water, gas, and heat meter remote range collection and remote range of meters. Control, establish a set of cross -industry energy data platforms for electricity, water, gas, hot meter charging, information release and real -time query, which are generally suitable for residential residential housing, schools, hospitals, office buildings, enterprises and other energy units.
a5, the bidding of water, gas, hot meter, and collection system projects, most of them have local water/gas/thermal company organizations. Entering the market bidding of water, gas, hot meter, and collection systems to provide more opportunities.
2017 --- 2018, the demand for smart meters is not strong, and the demand for energy meters, especially gas meters, has increased significantly , Together in the energy measurement industry, a contrast is formed. Therefore, the meter company needs to seize the opportunity and The source of the source and the collection system for innovative technology and marketing pioneering at the time!
The demand for smart meters is not strong. How does the meter company develop a diversified industry?
- "One of the Measures for the Development of the Mecar Industry in 2017"
This Chinese modern power grid measurement technology platform
December 10, 2017
2017 was another turnaround point in the history of the meter industry development exhibition. The demand for smart meters has suddenly fallen into the trough from the prosperity period of 7 consecutive years (2010-2016).
Id what are the highlights in the development process of the meter industry in 2017, and can it promote the continued research and application of the industry development in 2018?
· Intelligent meter demand is not strong. How can electric meter companies open a diversified industry?
· Follow topics of new technologies of the meter: mainly with the "instrument cloud" technology application, use the telecommunications interest and power grid gateway meter metering system to expand the system measuring function, the State Grid "dual core" intelligence The meter sample machine development and network operation assessment, Shanghai Power Grid formulated and implemented status testing and rotation schemes in single -phase smart meter operation, smart (advanced) terminals, DC electric power meters, broadband low -voltage power wire carrier communication interconnection and other technical standards were released , Implementation.
. The process of using telecommunications collection system communication technology bottlenecks: Mainly 4G wireless communication becomes the mainstream of remote communication, broadband low-voltage power line carrier communication expansion application, Beidou satellite communication pilot in multiple places, nb- --TOT communication exploration in the automatic metering system in the smart meter.
· State Grid "multi-table" information collection has slowly advanced, and the demand for gas meter metering has increased significantly. NB --- LOT communication is first applied in the meter meter metering collection; The National Development and Reform Commission and the General Administration of Quality Supervision, Inspection and Quarantine jointly issued the "Promotion and Construction of the Energy Consumption System for the Energy Unit of Key Energy Units", improve the energy measurement system, and promote the modernization and upgrading of electricity, water, gas, and thermal energy measurement and collection systems.
The highlights of the development of the meter industry in 2017, this article will be divided into narrative and release.
One of the highlights: The demand for smart meters is not strong. How does the meter company develop a diversified industry?
1. In 2017, the demand for smart meters of the State Grid fell into the trough, and the demand for collecting terminals dropped sharply. New changes of the bidding volume and demand
The national network of 2017 smart meters concentrated bidding volume of 37.78 million. Among them, the first bidding volume was 20.92 million, accounting for 55%of the total number of bidding for the year; the second bidding volume was 16.66 million, accounting for 45%. Two bidding volume is generally balanced. However, the total bidding for smart meters in 2017 (37.78 million) decreased by 62.2%of the highest annual bidding volume (100 million) in 2014.
-State Grid: In 2017, the total bidding of smart meters has been close to the bottom line of demand. The interpretation and reference of the new technical needs of the meter market and metering of the metering:
· In 2017, the coverage rate of telecommunications interest collection system for the provincial power grid reached more than 99%, and 17 million smart meters needed.
. The natural growth rate of new users of the state network power supply business area is about 3%, and 12 million smart meters need to be used.
· The construction of local government affordable housing, 3 million smart meters need to be used.
· Sale County, Dai Guan County Shang State Network Management 3 million tables.
· Measurement fault treatment (measurement failure rate is about 0.5%) with 2 million tables.
-The new change presented by the centralized bidding of the national network smart meter in 2017
· New phenotype. State Grid issued a 2 -level single -phase smart meter to increase the technical requirements of the battery. The bidding volume of batteries can be replaced by batteries throughout the year is 13.27 million, accounting for 41%of the annual single -phase smart meter bidding (32.37 million).
· New accessories: ultra -high -frequency RFID module, single -phase measuring failure identification module, measuring field operating terminal and peripheral storage box, three -phase measuring failure identification module, and on -site printing module.
The technical specifications of new accessories above: (to be query).
2) Collect new changes in the centralized bidding volume and demand of terminals
. In 2017, the annual centralized bidding volume was collected by 7.81 million units. Among them, the first batch of collection terminal bidding was 7.06 million units, accounting for 90%of the total annual bidding; the second batch of bidding was 760,000 units, accounting for 10%of the total bidding for the year. Wire. At the same time, the total number of concentrated bidding (7.81 million units) collected terminals in 2017 decreased by 29.5%compared to the highest bidding volume (11.09 million units) in the collection of terminals in 2016. These situations explanations: The construction of a telecommunications interest collection system for the provincial power grid has entered the ending stage.
In 2017, the new changes in the centralized bidding of the State Grid:
-Public Network 4G wireless communication module application becomes the mainstream of remote communication
n2017 In the year, the total bidding of the collection terminal (4G) module was 960,000 yuan, accounting for 66.7% of the total number of concentrator (converted 579,000 units) and the total number of specialized terminals (860,000 units) (14.39 million units). Essence Among them:
· The first batch of collection of terminal bidding for the first batch of 4G modules of 4G modules. Including:
The type Ⅰ (4G/broadband) 135,000 blocks
The type Ⅰ (4G/micro -power wireless) 22,000 blocks
The type Ⅰ (4G/narrow belt) 212,000 blocks
The Type III (4G) 120,000 yuan
· 2017 2nd batch of collection terminal bidding 4G modules are 471,000 yuan. Including:
The type Ⅰ (4G/narrow belt) 161,000 blocks
The type Ⅰ (4G/broadband) 135,000 yuan
Type II, III (4G) of the specialty terminal Ⅱ, III (4G)
The bidding volume of the above concentrator (4G) module can be known: the local communication methods of the concentrator include narrow belt carriers, broadband carrier waves, micro -power wireless wireless wireless Communication 3 category. It needs to be explained here: In recent years, the application of OFDM narrow belt rapid communication technology has increased, and it is said that it can reach a communication rate of 20K BPS.
-Broadband low -voltage electric line carrier communication technology expansion application
2017 The broadband carrier module was needed for 7.345 million yuan (excluding the second batch of local meters local communication wide band wave module bidding volume volume ), 245%of the bidding volume of broadband carrier modules in 2016. Among them: Broadband carrier modules have become mainstream in concentors and collectors; 26%of local communication in the meter.
. In the whole year of 2017, the collector and concentrator need to use a broadband carrier module of 4.915 million yuan, accounting for 71%of the annual collector and concentrator bidding (6.95 million units).
a1 The first batch of collectors and concentrations in 2017 requires 4.78 million broadband carrier modules, including:
The type Ⅰ (4G/broadband carrier) 135,000 Block
The collector type II (broadband carrier) 4.364 million pieces
The collector type (broadband carrier) 281,000 yuan
A2 2017 2017 The second batch of collectors and concentrations must use a broadband carrier module (concentrator type: 4G/broadband carrier)
135,000 yuan
· 2017 batch 1 The local communication (broadband carrier) module of the meter needs 2.43 million yuan, accounting for 26%of the total bidding for local communication modules in the first batch of telecommunications modules.
In 2017 The second batch of telecommunications (broadband carrier wave) module in 2017: (to be inquired)
3) In the first two years, Jiangsu and Shandong Power Grid has achieved smart meters. The full coverage of applications and telecommunications collection systems, why does it continue to have a large amount of demand for smart meters and acquisition terminals in 2017?
In 2014, Jiangsu Power Grid took the lead in the construction of the telecommunications interest collection system (36 million households); in 2015, Shandong Grid achieved a 100%(38 million households) coverage of the telecommunications interest collection system.
-The first batch of national network smart meters in 2017, collecting terminal centralized bidding
n · Jiangsu Grid 4.955 million units in this batch, accounting for the country 76.4%of the bidding volume of the network collector. The demand for a single -phase single -phase smart meter is 2.53 million, accounting for 6.6%of the total number of Jiangsu Power Grid (38 million households).
. The dictatorship terminal demand for the Shanxi Power Grid is 310,000 units, accounting for 54%of the bidding volume of the State Grid Specialty Terminal. Level 1 three -phase smart meter bids 822,000 units, accounting for 20.5%of the three -phase user (about 4 million households) of Shandong Power Grid.
-The 2nd batch of smart meters in 2017, collecting terminal centralized bidding
. 2.8 million single -phase smart meters in Shandong Grid Demand The first place in the meter requires 19.4%of the bidding volume of the smart meter in this batch. The demand for the centralized device is 120,000 units, and the first place in the provincial power grid concentration device accounts for 27%of the demand for the State Grid concentration instrument.
-above the situation: After the smart meter application of the provincial power grid and the construction of the telecommunications interest collection system are completed, the system meter and acquisition equipment continues to have the need for updates and expansion. n
· New user growth. The natural growth rate of new users of the year is 3----- to 5%. For provincial-level power grids with 40 million households, the annual demand single-phase smart meter is 12 million to 2 million.
· Early three -phase electric meter and collection terminal need to be updated. According to the 2009 version of the national network standard, the three -phase meter and collecting terminals. Because of its functions and reliability, many aspects do not meet the requirements of the 2013 version of the country network standards. Some smart meters and collecting terminal replacement need to be performed in advance.
· Application II collector. Local communication uses broadband carrier waves, which can greatly shorten the collection cycle.
· Smart meter, collection terminal or need to increase inventory reserve.
2, State Grid: 2010 --- 2017 Intelligent meter demand end and 2018 demand evaluation
1) 2010 --- 2017 End of the demand for smart meters r
2009 In the fourth quarter, the State Grid carried out the first centralized bidding for smart meters, but the bidding volume was not large.
2010 --- 2017, the State Grid organizes 2-4 smart meters in large quantities of centralized bidding each year. Essence
2010 --- 2017 National Net smart meter application and electric information collection system to achieve full coverage process:
years, A: Smart meter bidding volume, B: Cumulative number of collected households, C: Total number of users of the State Grid, D: Collection coverage
-In 2009, A: 011 billion, B: billion households, C: 200 million households, D: %
-In 2010, A: 045 million, B: 128 million households, C: 220 million households, D: 12.7%
-in 2011, A: 60 million only only only , B: 066 million households, C: 257 million households, D: 25.6%
-A: 76 million, B: 110 million households, C: 280 million households, D: 39.2 %
-in 2013, A: 066 million, B: 180 million households, C: 310 million households, D: 58%
-in 2014, A: 1 100 million, B: 256 million households, C: 378 million households, D: 68%
—— 2015, A: 91 million, B: 316 million households, C: 395 million households, D D, D, D : 80% rn rn — 2016年,a: 0.66亿只,b:3.82亿户,c: 4亿户,d:95.5% rn rn — 2017年,a : 038 million, B: 430 million households, C: 434 million households, D: 99%
Instructions: The above data is excerpted in online information or calculated for reference.
In the data of the centralized bidding of the national network smart meter from the above 2010-- 2017, and combined with the comprehensive situation of centralized bidding for smart meters, the national network materials department has been summarized to refine the demand for smart meter in the country, The law of changes in investment, the reference of the power gauge enterprise in the future when the new national network new meter bids in large quantities.
-In 2017, the State Grid power supply business area has a total of 430 million users. In the future, new users increased year by year with a natural growth rate of 3-5%year by year. For new users, the power supply department has been included in the demand for smart meters that year.
-2010--- 2017, the total bidding of the State Grid smart meter was 542 million (excluding the 2009 smart meter bidding of 111 million), and the total investment was 113.8 billion yuan.
In initial installation period of the smart meter (2010--- 2017): The average bidding volume of the National Grid annual smart meter was 68 million, with an average annual investment of 14.23 billion yuan; The maximum investment of 21 billion yuan in annual investment is 21 billion yuan; the annual bidding bottom line of smart meters is 38 million, and the annual investment bottom line is 8 billion yuan.
-2010 ----- 2017, the total bidding of the State Grid smart meter was 542 million, and the smart meter installation and applications were 140 million yuan. %. The main purpose of these balance meters is:
· Some early smart meters need to be replaced in advance. In 2009 --- 2012, a total of 192 million smart meters produced by the 2009 version of the national network standard, but it was difficult to estimate how many early smart meters were eliminated.
· Measurement fault treatment (measurement failure rate 0.5 --- 1%)
· inventory spare
n —— to win the meter company
2010 --- 2017, the winning bidding meter company with centralized bidding for smart meters in State Grid estimated 45---75, which changed with the bidding volume of the smart meter.
· It is said that the basic requirements of the State Grid Materials Department for the bidding meter enterprise: registered capital, production and sales of electric meter performance, smart meter production, management conditions, etc.
This The author of this article believes that the key difficulties of the nuclear power meter enterprise are the independent development capabilities of the meter, the collection terminal and the system. It is understood that some of the meter companies that have been shortlisted, medium and high -end smart meters adopted by OEM, especially in the past few years, concentrator, dictatorship terminal OEM, and buying design plan accounted for a large proportion, including the top 10 bids in the bid, Electric meter company.
· Winning amount of electric meter companies. From the Internet, the information of the Smartnet smart meter and collecting terminals: The amount of winning bids for the top 3 large meter companies in the winning bid is about 6%of each batch of smart meters and collecting terminal bidding. The percentage of the amount of the winning bids of the remaining meter companies decreased in order, and the bottom line of the winning bid amount was about 1%.
· The above-mentioned bidding meter enterprises with centralized bidding for smart meters above the State Grid Smart Meckets have a low percentage of winning bids, which will adversely affect the meter enterprises and State Grid:
a1 2010- -In 2017, the meter enterprise benefited and developed due to the stable smart meter market and the lack of demand for new technologies. The development of diversified industries has begun, especially the annual marketing revenue of large meter companies has reached 200--3 billion yuan. In 2017, the centralized bidding volume of the State Grid smart meter was 38 million yuan, investment of 8 billion yuan, and the top 3 large -scale meter companies in the winning bid won 6%and 480 million yuan, which only accounting for
r, which only accounts for annual operating income. n 24--16%, it is difficult to support the long-term development of electric meter companies, and prompt it to be eager to develop a diversified industry.
A2 smart meters needed by the provincial power grid, which are generally supplied by more than a dozen home appliance meter enterprises. The quality of the product is difficult to ensure the consistency. Essence
· Also, after 2012, the annual bidding volume of the State Grid smart meter increased, and the maximum annual bidding volume reached 100 million. As a result, electric meter companies have increased investment and expand production capacity. After 2017, the demand for smart meters fell into a trough, and the production capacity of the meter enterprise was seriously overcapacity and needed to be considered. Emergency supply, expanding production capacity, can take multiple measures.
2) In 2018, the demand evaluation of smart meters and the expectations of the "dual -core" smart meter to the market
-According to online forecasts, 2018 may be the needs of the meter market. In the lowest year, the bidding volume of the State Grid smart meter was about 33.44 million.
In 2018, the provincial power grid continues to have batch requirements for smart meters and collecting terminals after completing the full coverage of smart meter applications and electricity information collection systems. It has been described that State Grid: The natural growth rate of new users is 3%, and 12 million smart meters are required; the construction of local government affordable housing, 3 million smart meters must be used; With 3 million tables; 2 million tables for measurement failure. In total, the first four market elements are combined with 20 million smart meters.
· 2010 --- 2012, early smart meter applications were 192 million. If you update 7%in advance, you need to use smart electricity
Tables 13.44 million.
· The above five market elements are combined with the above five market elements. In 2018, the national network needs to use 33.44 million smart meters, which is 11.5%compared to the 2017 National Network smart meter bidding volume, which is the highest year of the smart meter in 2014 The quantity (100 million) decreased by 66.5%.
-The expectations of the "dual -core" smart meter entering the market
"Interpretation and Citation of the State Grid Power Power Power Tetal Market and New Technical Demand in May 2017" Expure the revision process of the development of the "dual -core" smart meter development and the 2013 version of the smart meter enterprise.
The current situation has changed again. Since the implementation of the Guidance of the State Grid Measurement Work in 2017 (National Power Grid Marketing [2017] No. 105), the Global Watch Magazine has successively published the "dual core" smart meter Article: "Research on the Design Plan of an Intelligent Electric Table Design Based on IR46 Concept", and "Smart Electric Power Table Design Based on OIML R46 International Proposed Intelligent Electrical Power Table". Recently, the information from the Hebei Shijiazhuang Industry Conference: The State Grid "Double Core" smart meter standard may be approved in 2018, that is, the 2013 version of the national network smart meter standard revised version, which is expected to be implemented in 2019. In this way, the "dual -core" smart meter sample machine runs after the development and inspection of the network in 2019; in 2020, there may be batch applications. It is said that because the investment of the "dual -core" smart meter installation and application has not yet been implemented, the time for the new type of meter to the market in batches may be extended by 1 year than the previous expectations.
-There is also a factor affecting the demand for smart meters in 2018: detection and status rotation in the operation of single -phase smart meters
In 2010 8 years of operation, after entering 2018 to cyclical rotation.
In 2017, Shanghai Local Measurement Regulations: "Status detection scheme of single -phase smart meters in operation" has been released and implemented in Shanghai Power Grid. However, it has not been seen that the State Grid measurement department has reported reports on single -phase intelligent power meters according to cycle or status testing and rotation methods. The annual measurement work promotion meeting held in early 2018 will make a unified arrangement. For example, the State Grid implements the status detection and status rotation method of a single -phase smart meter, and the single -phase scheme that passs the status test will extend the operating cycle for several years. This will help the power grid save resources and reduce investment;
3, meter company: How to develop a diversified industry?
Shortly after the implementation of smart meters in the State Grid, some electricity meter companies have felt that the smart meter market of the State Grid will be restricted, and it has begun to explore the exploration of diversified industries. However, the transformation of meter companies generally takes shortcuts: OEM imitation or merger target enterprises, becoming a new growth point for corporate marketing as soon as possible.
1) In May 2017, the interpretation and reference of the State Grid meter market and the needs of new technical needs of the State Grid Meeting "reminded: Symbol companies need to carefully study the topic selection of new products to develop new products.
-Except smart meter, collection terminal, low -voltage measurement box, as well as expensive and relatively large meter markets, including special meters, online monitoring, harmonic metering, 10KV electronics, 10KV electronics 9 categories of meter -in systems such as the formula -based instrumental cloud "instrument cloud.
-Power users' self -procurement market. The main measurement products are: statistical meter series, one card, energy measurement table and monitoring system, street light intelligent control system, petroleum/coal mine special measurement equipment and other 9 categories.
-considering the long -term development of the enterprise, the transformation of the meter enterprise mainly takes the path of the development of technological innovation products, including: the application of the intelligent (advanced) terminal in the field of energy measurement, the "instrument cloud" and the three -phase phase of the three phases Multifunctional meter fusion technology development, electricity information use system main station to expand big data applications, large user harmonic measurement assessment, measurement device loss data self -aid data and other functions.
2) The meter enterprise regulates the demand for the dependence of the state network's smart meter market
The previous narrative: 2010-- 2017 National Net smart meter demand and investment change laws have already been Mingshu: State Grid is a central state -owned enterprise. Smart meters and collection terminal centralized bidding are independent behaviors of the enterprise. Smart meters, collection terminals, and low -voltage measurement boxes are the three basic markets, eternal markets of electric meter companies. However, the annual recruitment, investment, and distribution strategies of the State Grid smart meter and collection terminals (that is, the number of bidders and the low amount of bids) are no longer suitable for the rapid and long -term development needs of telephone meter companies. Therefore, on the basis of continuing to do a good job of the State Grid smart meter market, the meter enterprise regulates its dependence on the SME smart meter market, and pioneering a diversified industry is a long -term and useful development process.
3) To develop a diversified industry, it is necessary to prefer development projects
In recent years, the transformation direction of large meter companies is different. According to online information: Lin Yang, it mainly develops new energy development projects, and has initially achieved results; Kelu, smart grids, energy -saving products and other positions have been developed; Victoria, focusing on the development of smart distribution products, water, gas, and thermal energy measurement measurement And energy efficiency management equipment and systems.
This of information tracking and analysis of the development of new products for transformation of electricity meter companies in this article can be considered as: Weisheng, pioneering and expanding the energy measurement industry, it is relatively stable and performance is obvious. Its main features:
-reorganized and strengthened Weisheng Information Technology Company to increase investment in funds and senior talents. It is understood that Weisheng Group has enriched a number of senior technical and management talents of the original meter and terminal products, and a number of doctoral talents enriched the Weisheng Information Technology Company.
-The starting point of the new product project of the diversified industrial product is relatively high and forward -looking. Weisheng's electricity, water, gas, and thermal energy measurement projects take AMI as the general starting point. It not only assembles water, gas, and heat meter assembly, and controls and collects. The bidding opportunities of the metering system project have been fully rolled out of electricity, water, gas, and thermal energy.
The energy metering system engineering case:
· Mining area water, electricity, gas meter meter remote collection, control project
n · Uzbekistan AMI project
· The first multi -table collection item of the Southern Power Grid
· Shanghai Electric Power Company implemented "Multi -Table Collection, Multi -Units One, Multi -Fees Harvest" project
-Weisheng is based on the meter as the base, and the main business of smart distribution products, energy measurement and energy efficiency management equipment. In 2017, the operating income of Weisheng's energy measurement products is estimated to be more than 1 billion yuan, and the operating income of the smart meter may reach 0.65: 1. It can be said that the energy measurement and system development and marketing of Weisheng Information Technology Company have entered a state of stability and development, and accumulated the development experience of diversified industries.
4) The meter enterprise expands to the water, gas, and thermal energy measurement market at the time!
-The new policy for the development of the country's energy measurement has successively introduced
. In February 2016, the National Development and Reform Commission, the National Energy Administration, Industry and Information Technology jointly released the "About Promotion" The guidance of the development of the Internet "The requirements for the development of smart energy (Development and Reform Energy [2016] No. 392)" proposes: "In -depth integration of energy, information and communication infrastructure".
· I have been described earlier. In September 2017, the National Development and Reform Commission and the State Administration of Quality Supervision, Inspection and Quarantine issued a notice of the "Promotion and Construction Work Plan for the Energy Consumption System of Key Energy Units" ( ] No. 1711 proposed: Accelerate the energy consumption of the energy consumption of the energy consumption of the key energy unit and improve the requirements of the energy measurement system.
It is seen that with the advancement of the energy consumption of energy consumption system for energy Internet and key energy consumption, the opportunities for comprehensive and balanced development of electricity, water, gas, thermal energy measurement and collection system construction are coming!
-water, qi, enthusiasts, and industrial collection system construction processes are different, and the lack of authoritative high -level departments to promote the intelligent process of energy measurement vertically. The construction of the national intelligent water, gas, hot meters and collecting systems is difficult to count. However, the development of the meter enterprise is different, and the development of diversified industries needs to be developed.
In August 2016, the "Four Tables Collection of Electricity, Water, Qi, and Hot" written by Weisheng Li Hong/Shandong Power Industry Zhang Chunhui " R n
a1 water meter industry: about 3,000 tap water companies nationwide, 300 water meters and supporting manufacturers. By 2015, the annual output of water meters was 90 million. Among them, smart water meters accounted for 10%.
a2 gas meter industry: about 800 gas companies nationwide. There are 100 traditional gas meter manufacturers and 30 smart gas meter companies. By the end of 2015, the annual output of gas meter was 35 million; the annual output of smart gas meter was 19 million, accounting for 35%of the total annual output of the gas meter. Gas ultrasonic flowmeters mainly depend on imports.
a3 hot meter industry: The main market is in the heating area of 15 provinces in the north. In 2013, the national heating area was 6.5 billion square meters, with heat metering of 21%, and 18 million hot meters were installed. On average, each hot meter was measured by 77 square meters. At present, the annual new heating area is 30,000 to 400 million square meters, and the annual demand is 4 million.
a4 and the meter industry: about 2,800 county -level power supply companies, and about 270 power supply companies in the country (city). By 2016, there were about 360 currently on the existing meter, and it is estimated that the annual production of 140 million meters. Among them, the State Grid and South Network adopted 80 million, export meters of 46 million, and power users' self -procurement market was 1.14 million.
In the end of 2017, the State Grid power supply business area achieves 100%coverage of smart meters and telecommunications interest collection systems (430 million households).
- "Multi -table unity" information adopts slowly promoting. State Grid, launched the "Multi -Table One" information collection project in 2015 to explore new business models. Estimation from online information: 2016--- 2017, the State Grid may implement "multi-table integration" information collection of 5 million households, and its process is different than the original plan "13th Five-Year Plan" information collection. Far. It should be said that the "multi -table integration" information collection of the State Grid has the support of the competent economic authorities of the higher level, the attention and coordination of the competent department of the local government industry, the contemporary efforts of power supply companies, and many favorable conditions for engineering funds. However, so far, the process of "multi -table unity" is slow. This is the competent department of the superior and the local government industry, the State Grid needs to think deeply, solve the problems, and adjust the relevant business strategies and requirements to ensure that the "multi -table integration" information collection continues to continue. Promote before.
-The meter enterprise integrates water, gas, hot meter, and collecting system technology, market development and application. The intelligent rate of water, gas, and heat meter meter requires a large amount of capital and senior talents. After many years of construction, the qi and thermal industry collection system already has a certain foundation. However, the system application situation is not ideal, and the communication application technology is relatively backward.
A3 industry management: The thermal energy measurement industry is coordinated and managed by the competent local government industry department. There is no unified industry management agency in the country to formulate energy meters and collect system product standards to carry out industry business exchange activities. The industry information is not smooth. The shortcomings of the development of water, gas, and thermal industries above N
a4 are existing the existing development length of the meter company. At the same time, in recent years, Weisheng Information Technology Co., Ltd. You can learn from the experience of development with the market:
In online information, the integrated information collection system of Weisheng Information Technology Company is based on the telecommunications interest collection collection system. Quoting its collection terminal and communication channels, only the communication interface converter (collector) is added, and the data of smart gas meters, smart water meters, and smart heat meters is collected to the management system to achieve electricity, water, gas, and heat meter remote range collection and remote range of meters. Control, establish a set of cross -industry energy data platforms for electricity, water, gas, hot meter charging, information release and real -time query, which are generally suitable for residential residential housing, schools, hospitals, office buildings, enterprises and other energy units.
a5, the bidding of water, gas, hot meter, and collection system projects, most of them have local water/gas/thermal company organizations. Entering the market bidding of water, gas, hot meter, and collection systems to provide more opportunities.
2017 --- 2018, the demand for smart meters is not strong, and the demand for energy meters, especially gas meters, has increased significantly , Together in the energy measurement industry, a contrast is formed. Therefore, the meter company needs to seize the opportunity and The source of the source and the collection system for innovative technology and marketing pioneering at the time!